top of page

Long leads are the same as your standard leash, but in XL sizes! These long leads are perfect for giving your pup that extra freedom, while ensuring you always maintain control. Long leads come standard with a handle and D-ring.

*3/4" Biothane can get very heavy at extra long lengths. Consider getting 1/2" if your pup is on the smaller/medium size.

 

* Length is total length of leash inlcuding handle (not including hardware)

3/4" Long Lead

From C$50.00Sale Price
0/500
Quantity
    • Facebook
    • Instagram

    ©2021 by That's so Fetch Collar CO.

    bottom of page